Underlayment is to be installed over the eave starter.
Westman steel roofing installation guide.
4 panel wood screw space according to recommended fastening pattern and local codes.
Add the metal panels.
Take your first sheet of metal and place it on the roof so that it overhangs the edge at least 3 4 in 1 9 cm.
Installation guide handling.
Stack short sheets on top of longer ones.
Fasten valley in place with clips and fasteners on the outer edge of the valley every 16 on center.
Installation guide important notes.
When installing roofing panels take care to avoid walking on the butt of the panels.
Accurately measure the roof and create a roof plan for estimating and ordering roof panels and accessories ensure all required roof penetrations are in place before beginning pluming vents exhaust attic venting etc remove any dirt or debris from.
Notch hem of top valley and overlap valley 4 and put 2 rows of sealant between overlap.
To prevent solar heat buildup avoid covering the stack of sheets with a dark tarp or other heat absorbing material.
Roof sheets step 4.
Achieving rooftop architectural expressions is easy with westman roofing products.
Simply choose the installation guides appropriate for your project.
Take care the first piece is aligned precisely perpendicular square to the edge.
Always begin working at the point with the longest peak to eave distance.
Store sheets in a cool and dry place out of direct sunlight.
Wall sheeting step 9.
Gable trim after applied step 6.
Install base flashing step 7.
Fasten eave starter with 10 x 1 long galvanized zip screws 12 o c.
From basic sheet steel cladding to snaplok roofing panels and on to more sophisticated steel shingles with stone coating and even steel spanish tiles.
5 outside closure install along upper edge of panels about 2 below the edge.
Clean sheets of any debris before installation.
Screw length is to be long enough to penetrate the decking.
During cutting secure sheets to ensure clean cuts.
3 roofing panel install with lower edge overhanging eave edge by at least 1.
Install eave starter at all eaves.
Begin installation on side away from wind rain direction.
Use a circular saw with a fine tooth blade at a high speed but a low advance rate to cut 3 4 sheets at a time.
Installation consists of the following steps.
Material checklist step 2.
All products offer advanced benefits such as long service lives easy installation and little maintenance over traditional roofing materials.
Install ridge cap step 5.
Trim the bottom of the valley to the correct angle and allow 5 8 to bend around the eave starter.
Other wall trims and flashings step 8.